Extension of the Tram-Train T13 (Phase 2)

Phase 2 of the T13 tram-train connects Saint-Germain to Achères, via a hybrid tramway/train infrastructure. Vulcain supports SNCF Réseau in project management, interface management, obtaining authorizations and overall project supervision.

Duration

2020 - Ongoing

Countries

France

Sectors

Infrastructure and Railway

Customer

SNCF Réseaux

Intérieur d'un tram vide

background

The T13 tram-train extension project between Saint-Germain-en-Laye and Achères is part of a regional strategy for the development of sustainable and multimodal mobility. The infrastructure, which combines the technical specificities of the tramway and the railway, involves a high level of complexity. Vulcain works alongside SNCF Réseau to provide project management assistance covering all phases of the project, from the preliminary design (AVP) to the end of the guarantee of perfect completion.

‍

The project, with a budget of €361 million, is marked by the coexistence of numerous public and private actors, and by significant programmatic changes. The introduction of an eco-design approach reaffirms the environmental ambition of the project.

Customer needs

SNCF Réseau was looking for a partner capable of managing a complex project combining rail and tram infrastructure, with multiple interfaces and strong administrative, technical and environmental constraints. Vulcain responded by providing a global vision, detailed risk management and continuous support until commissioning.

Ingénieur qui analyse un train
Personne travaillant sur des schémas

Specificity of the mission

Vulcain provides project management assistance throughout the project cycle: studies, interface management, environmental monitoring, technical coordination, and management of administrative authorizations. The teams also introduced eco-design into the project approach, by integrating the project owner's CSR objectives and regulatory constraints.

Image gallery

In addition to cookies that are strictly necessary for the operation of this website, Vulcain Engineering Group uses cookies and other tracking tools to remember your preferences and offer you additional services, to measure the performance of our website.

If you click "Accept" cookies, all these categories will be enabled to optimize your online visit. To configure your cookie settings, click on "Customize my cookies." Please note that if you choose to decline them, your browsing experience may be limited.
VULCAIN ENGINEERING GROUP will store your preference for 13 months. You may change your mind at any time by clicking on this link.

Cookie preferences

Protecting your privacy is important to us. That is why you have the option to disable certain types of data storage that are not essential for the proper functioning of the site.
However, blocking certain categories may affect your browsing experience.

Essential

These cookies are essential for the website to function optimally: fs-cc, finalité, fs-consent-ad_storage, fs-consent-ad_user_data, fs-consent-ad_personalization, fs-consent-analytics_storage, fs-consent-functionality_storage, fs-consent-personalization_storage, fs-consent-security_storage.

Marketing, Personalization

We do not collect or store data for marketing purposes. Furthermore, this site has been designed without personalization. However, if you would like to suggest specific features, you can contact us.

Analytics

These elements help us understand how visitors interact with the site and whether any technical issues exist. This type of storage does not collect information that identifies a visitor.
The cookies involved are _ga, finalité, and _ga_V26XD7WTR8.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.