Renovation of Orly South Terminal

Infrastructure

The renovation of Orly South Terminal, including the passenger security control area, the emigration control, the commercial area, the company lounge area, the contact boarding room, the drop-off gallery, the new check-in area and the new luggage handling system (STB), will improve the reception of the more than 7 million annual passengers in this boarding hall.

OUR CONTRIBUTION

Project management and monitoring :
  • Management of multi-disciplinary interfaces between the GC – Electricity – Secondary work packages
  • Management of the project’s development while respecting the cost objectives of the works
  • Drafting of the Quality Master Plan (QMS)
  • Preparing the project team for the final deadlines
  • Interfacing with the operator
Location
Roissy-en-Brie, France
Completion date
2019
Clients
groupe ADP logo client vulcain engineering

Other projects

Environment
Rabigh 3

ACWA Power has awarded a contract to the consortium formed by ABENGOA, SIDEM and TIEJUN (SEPCOIII) for the building of the Rabigh 3 independent production…

Renewable Energy
Eolien – Multi projects

These projects consist of the HSE supervision of several wind turbine erection sites. The work includes, receipt, scaffolding erection operations and all work…

Renewable Energy
Saint-Brieuc – Ailes marines

The Saint-Brieuc wind farm, which is scheduled to come on stream in 2023, will consist of 62 wind turbines each rated at 8 Megawatts giving a total output of…

innovation vulcain engineering
INNOVATION
Vulcain R&D

Building on our expertise in engineering and offshore structures, Vulcain launched a research programme on offshore wind energy in 2018.

The R&D centre is…

Renewable Energy
Bim 2

Built by Bouygues Energy & Services, the BIM 2 solar power plant, located in the south of Vietnam’s Ninh Thuan province, is the largest solar farm in operation…

Railway
Eole

Eole is a project to improve the mobility of the residents of Ile-de-France. In 2024, the current RER E will be extended 55 km to the West from the Haussmann…